Project Overview
Built a Resource Recovery Centre and Commercial Transfer Station in Powell River for the quathet Regional District. Utilizing a pre-engineered building with 4 outbuildings, this was our largest build to date!
Consultant
Herold Engineering Limited
Size
18,000 Sq. Ft.